The shaping of the two larger hills is almost finished, I just need to fill all the gaps and then add several coats of PVA before adding scatter, etc. The smaller hill is a first attempt at a terraced hillside. The walls have been coated with "hard as nails" and then gravel pressed into the surface. I'll need to do this on the slopes of the hilltop town.
20/03/2015
Starting work on the hills
I was lucky and found an almost complete sheet of "Celotex" foam insulation in a skip just down the road, so I definitely have enough for the seventeen (17!) hills I need for the big game. Here are the first three roughed out and the beginnings of a hilltop town.

The shaping of the two larger hills is almost finished, I just need to fill all the gaps and then add several coats of PVA before adding scatter, etc. The smaller hill is a first attempt at a terraced hillside. The walls have been coated with "hard as nails" and then gravel pressed into the surface. I'll need to do this on the slopes of the hilltop town.
The shaping of the two larger hills is almost finished, I just need to fill all the gaps and then add several coats of PVA before adding scatter, etc. The smaller hill is a first attempt at a terraced hillside. The walls have been coated with "hard as nails" and then gravel pressed into the surface. I'll need to do this on the slopes of the hilltop town.
Subscribe to:
Post Comments (Atom)
1 comment:
Sure that was a skip Will, and not a delivery van!
Post a Comment