21/06/2007

Arab Houses WIP (2)

The buildings have now been based and the bases coated in tetrion.
On the tomb and the house with steps I added some drilled wooden blocks before plastering. These blocks will provide a firm fixing for the palm trees shown.

Will

No comments: